Ask a studio why a portrait takes three to five weeks and you will usually get a vague answer about scheduling and artist workload. The real answer is more interesting, and it explains something a calendar cannot: an oil painting is not one coat of paint. It is four to six distinct layers, each with its own drying window, stacked in a strict order the paint chemistry enforces. Skip a window and the painting does not fail today — it fails in three years, on someone else's wall.

The five stages every commissioned oil portrait passes through

Names vary between studios; the sequence does not. For a typical 16 × 20 in or 20 × 24 in portrait, the build looks like this:

  1. Transfer and drawing. The approved composition from the digital mock-up is drawn onto the primed canvas — either as a graphite transfer or a thin raw-umber sketch. On a portrait this stage also fixes the sightlines: eye level, head tilt, the angle of the shoulders. Half a centimetre here reads as a stranger in the finished painting, so this is where likeness is won or lost. Roughly a day.
  2. The toned ground. The white canvas is washed with a thin, translucent layer of warm colour — raw sienna or burnt umber thinned with solvent, sometimes called the imprimatura. White canvases make every colour painted on top look harsh; a warm mid-tone lets skin glow against it and gives the shadows something honest to sit on. Dries in a day.
  3. Blocking in. Thin, fast-drying paint maps the whole painting at once: where the darks go, where the light falls, the background temperature. Everything is thin, everything is lean, nothing is precious. This layer is about correcting the composition while correcting it is still cheap. One to two days of work, then it dries for several.
  4. Colour layers. The painting gets its body: skin built up in wet-into-wet passes, clothing and background worked to their final temperature. On portraits this is the longest stage — often two full weeks on a two-subject canvas, because a face is repainted until it reads at three metres and at thirty centimetres.
  5. Details, glazes and accents. The last few percent that people actually remember: catchlights in the eyes, the edge of an eyelid, a wedding ring, the rim of light along a collar. Glazes — transparent paint over dried colour — deepen shadows without painting over them. Two to four days, and it changes how the whole painting reads.

Fat over lean: the one rule the paint enforces

Oil paint does not dry by evaporation like watercolour or acrylic. It hardens by oxidation — the oil absorbs oxygen and polymerises into a solid film, a process that takes days for a thin layer and weeks for a thick one. Because the film keeps flexing and tightening for years, the layers underneath must stay slightly more flexible than the layers above them. That is the whole of the rule the industry calls fat over lean: each new layer should carry more oil than the one before it.

Break the rule and the picture looks perfect at the studio. Then, over two to five years, the stiff top layer and the soft layer beneath it pull in different directions as light and heat flex the canvas. The results have names painters dread: a crack network called craquelure arriving decades early, fine wrinkles where thick paint dried over wet underlayers, dull "sinking-in" patches where a lean layer starved the oil out of the one above it, and in bad cases whole flakes lifting off. None of this is visible when the painting is handed over. All of it is caused by drying windows that were skipped.

This is also why a "24-hour oil portrait" is not a fast oil portrait — it is acrylic, or a print with texture, in practice. The two are honestly compared in our guide to oil versus acrylic portraits.

What each layer is waiting for

  • Thinned layers (transfer wash, toned ground): touch-dry in 12–24 hours.
  • Standard blocking layers: dry enough to overpaint in 2–4 days, longer in humid weather.
  • Heavy or buttery passages (thick clothing folds, impasto highlights): 5–7 days before anything goes on top.
  • Wet-into-wet skin work: no drying window at all — that is the point. Fresh colour is worked into wet colour, which is the one thing acrylic genuinely cannot do.
  • Glazes: painted over colour that has dried to the touch, then given their own days before the surface is sealed.

Add those windows to real painting time and the arithmetic stops being mysterious. A single-subject portrait carries roughly 12–15 working days of brush time plus 6–10 days of mandatory drying, which lands it squarely in the three-week bracket. A two-subject canvas roughly doubles the brush time; four subjects or heavy detail push the total toward five weeks. The full calendar, day by day, is in our commission timeline guide.

A five-week calendar, week by week

WeekWhat the studio is doingWhat you would see if you peeked
0Photo review, digital mock-up, your approvalA sharp image of the proposed crop and background
1Transfer, toned ground, blocking inA loose brown-and-white version of the whole picture
2First colour layers; drying windows betweenReal colour, still approximate faces
3Colour layers refined; likeness lockedThe painting looks nearly finished — and is not
4Details, glazes, edges, signatureCatchlights, rings, softened background edges
5Final check, varnish, photograph for your approvalA photo of the real canvas in your inbox

Notice week 3. The stage where a painting "looks nearly finished" is the most dangerous moment to ship it. The remaining 10 percent — glazes, edges, details — is precisely what separates a painting people compliment from one people look at twice.

What the mock-up buys you

None of the layers above should be spent deciding the composition. That decision belongs to the digital mock-up, produced from your photograph before the first brushstroke: the crop, the background, who is in, who is out. Because the plan is locked while the canvas is still blank, no layer ever has to be scraped off and repainted — which is the single most expensive thing that can happen inside a painting. Approving a mock-up costs you nothing and typically saves the studio a full week of wasted layer cycles, which is why we will not start painting without one.

What the layers cost

Price does not depend on how many layers a painting needs — it depends on size and subject count, and the full table is published on the site, not hidden behind a quote form:

Canvas size1 subject2 subjects3 subjects4+ subjects
8 × 10 in$189$259——
12 × 16 in$289$379$459—
16 × 20 in$389$499$619$749
20 × 24 in$549$699$849$1,029
24 × 36 in$789$1,059$1,290$1,560
30 × 40 in$1,090$1,449$1,749$2,090
36 × 48 in$1,390$1,849$2,249$2,690

A rush commission — three weeks total, painting included, at $90 — does not compress the chemistry. It compresses the calendar around it: the mock-up is turned around in hours, drying windows are stacked in parallel across a second canvas if needed, and simpler backgrounds are recommended honestly. What it never does is skip a drying window, because the bill for that arrives two years later as a cracked surface.

How to tell whether a finished portrait was rushed

If you ever receive (or inherit) an oil painting and want a thirty-second inspection, do this:

  • Hold it at an angle to a window or a single lamp and look across the surface. Fine regular wrinkling in thick passages means thick paint went over paint that was still wet.
  • Look for circular cracks, small and dense, especially on light-coloured clothing. Fresh craquelure on a new painting is a shortcut taken somewhere in the stack.
  • Look for dull grey patches where the colour should be rich. Sinking-in means the layer below robbed the oil from the layer above.
  • Ask whether the painting was varnished, and with what. An archival final varnish on a properly built painting is standard; its absence, on a new canvas, is a clue.

None of this means a slightly imperfect surface is a worthless painting — old paintings crack all the time. It means the three weeks you were asked to wait were not theatre.

The short version

  • An oil portrait is 4–6 layers: drawing, toned ground, blocking, colour, details and glazes.
  • Each layer waits a real drying window — 1 to 7 days depending on thickness — because oil hardens by oxidation, not evaporation.
  • Fat over lean is not a style preference; skip it and the surface cracks within a few years.
  • Three to five weeks is the honest total for one to four subjects. $90 buys a genuine three-week rush; nothing honest buys a three-day oil painting.
  • Composition is decided in the mock-up, before paint, so no layer is ever wasted.

When the painting reaches your wall, the layers stop mattering and the surface care starts: the guide to cleaning and caring for an oil painting covers dusting, light and humidity. If you have a photo ready, the custom portrait prices are all on one page, and the quote form gets you a fixed price and a date — usually within a day.